| 1 | FOFS-KLM-03 | RASPA-BOYA FORMEN OFİSİ DUVAR TİP KLİMA 9000BTU (24-118554-07) | 1 Ay | 20.07.2026 | plan dahilinde | |
| 2 | FOFS-KLM-05 | TEMİZLİK İŞLERİ FORMENİ OFİSİ DUVAR TİP KLİMA 9000BTU (24-111536-06) | 1 Ay | 20.07.2026 | plan dahilinde | |
| 3 | GVN-KLM-05 | ANA GİRİŞ MİSAFİR BEKLEME KONTEYNERİ DUVAR TİP KLİMA 12000BTU (25-217132-11) | 1 Ay | 20.07.2026 | plan dahilinde | |
| 4 | KMPD-HKM-02 | KOMPRESÖR ODASI NO:2 HAVA KOMPRESÖR | 1 Ay | 18.07.2026 | plan dahilinde | |
| 5 | KMPD-HKM-03 | KOMPRESÖR ODASI NO:3 HAVA KOMPRESÖR | 1 Ay | 18.07.2026 | plan dahilinde | |
| 6 | KMPD-HKM-04 | KOMPRESÖR ODASI NO:4 HAVA KOMPRESÖR | 1 Ay | 18.07.2026 | plan dahilinde | |
| 7 | BATL-HKMP-07 | ALT YAPI BAKIM ATÖLYESİ HAVA KOMPRESÖRÜ NO:7 | 1 Ay | 18.07.2026 | plan dahilinde | |
| 8 | MBL-GAK-17 | GAZ ALTI KAYNAK MAKİNESİ NO:17 ESAB MİG 4000 İ | 1 Ay | 18.07.2026 | plan dahilinde | |
| 9 | MBL-GAK-18 | GAZ ALTI KAYNAK MAKİNESİ NO:18 ESAB MİG 4000 İ | 1 Ay | 18.07.2026 | plan dahilinde | |
| 10 | MBL-GAK-19 | GAZ ALTI KAYNAK MAKİNESİ NO:19 ESAB MİG 4000 İ | 1 Ay | 18.07.2026 | plan dahilinde | |
| 11 | MBL-GAK-08 | GAZ ALTI KAYNAK MAKİNESİ NO:8 LİNKOLN POWERTECH 500 S | 1 Ay | 18.07.2026 | plan dahilinde | |
| 12 | MBL-TZK-31 | TOZ ALTI KAYNAK MAKİNESİ NO:31 ESAB LAF 1000 DC | 1 Ay | 18.07.2026 | plan dahilinde | |
| 13 | MBL-AK-50 | ARK KAYNAK MAKİNESİ NO:50 ESAB ORİGO ARC 430 (6'LI GRUP) | 1 Ay | 18.07.2026 | plan dahilinde | |
| 14 | MBL-GAK-16 | GAZ ALTI KAYNAK MAKİNESİ NO:16 LİNKOLN POWERTECH 500 S | 1 Ay | 18.07.2026 | plan dahilinde | |
| 15 | MBL-GAK-30 | GAZ ALTI KAYNAK MAKİNESİ NO:30 AS KAYNAK MAGSTER 451 | 1 Ay | 18.07.2026 | plan dahilinde | |
| 16 | MBL-GAK-25 | GAZ ALTI KAYNAK MAKİNESİ NO:25 JACKLE PRO PLUS 400 | 1 Ay | 18.07.2026 | plan dahilinde | |
| 17 | YHY-DPMP-01 | HARİCİ BALAST POMPASI NO:1 100KW (PARK YÜZER HAVUZ YALOVA TARAF) | 1 Ay | 18.07.2026 | plan dahilinde | |
| 18 | YHY-DPMP-02 | HARİCİ BALAST POMPASI NO:2 55KW (PARK YÜZER HAVUZ YALOVA TARAF) | 1 Ay | 18.07.2026 | plan dahilinde | |
| 19 | YHK-VGR-01 | YHZ-3 NO:1 VALF GRUBU (4'LÜ) | 1 Ay | 17.07.2026 | plan dahilinde | |
| 20 | YHK-VGR-02 | YHZ-3 NO:2 VALF GRUBU (4'LÜ) | 1 Ay | 17.07.2026 | plan dahilinde | |